
The Massachusetts

3 Bedroom Chalet

Upstairs of The Chalet
Home Features
BEYOND THE STANDARD FEATURES
12/12 – 90# Roof Ipo 60#
R-24 Wall Insulation
R-48 Ipo R-38 Roof Insulation
Cape Close off (Door, 2x4 Material for Walls and Ceiling,
Sheetrock and Insulation)
19/32” Loft Decking
Prow Roof
Small Picture Window Ipo Std Over Kitchen
8x30 Window in Serenity Shower
2 Phone Jacks
Led Surface Mount Lights
Whisper Green Fan with Light in Utility
Dimmer Switches (Light over Sink, Kitchen Area, DR and LR
Soffit Area)
Extra GFI Receptacle
Block, Wire and Switch in Vault Area
Second Conduit in Panel Box
Special Cedar Railing
Luxury Flooring in Kitchen and Hallway
Ceramic Backsplash in Kitchen
Lazy Susan Base Cabinet
Stainless Steel Farmhouse Sink with HB Pulldown Faucet
Crescent Edge in Master Bath
Serenity Shower with Led Lights, Soap Dish
Crescent Edge in Hall Bath
Luxury Flooring At Front Door and Small Hallway Section
Luxury Floor in Ding Room
Crescent Edge in Utility
Black Gas Appliance Package
Clay Mod Package
Two Junction Boxes in Prow Roof
Run (2) ¾” Pex Lines Upstairs for Future HWBB
Ship Lose 34’ Carpeting, Pad and Tack Strip
R-24 Wall Insulation
R-48 Ipo R-38 Roof Insulation
Cape Close off (Door, 2x4 Material for Walls and Ceiling,
Sheetrock and Insulation)
19/32” Loft Decking
Prow Roof
Small Picture Window Ipo Std Over Kitchen
8x30 Window in Serenity Shower
2 Phone Jacks
Led Surface Mount Lights
Whisper Green Fan with Light in Utility
Dimmer Switches (Light over Sink, Kitchen Area, DR and LR
Soffit Area)
Extra GFI Receptacle
Block, Wire and Switch in Vault Area
Second Conduit in Panel Box
Special Cedar Railing
Luxury Flooring in Kitchen and Hallway
Ceramic Backsplash in Kitchen
Lazy Susan Base Cabinet
Stainless Steel Farmhouse Sink with HB Pulldown Faucet
Crescent Edge in Master Bath
Serenity Shower with Led Lights, Soap Dish
Crescent Edge in Hall Bath
Luxury Flooring At Front Door and Small Hallway Section
Luxury Floor in Ding Room
Crescent Edge in Utility
Black Gas Appliance Package
Clay Mod Package
Two Junction Boxes in Prow Roof
Run (2) ¾” Pex Lines Upstairs for Future HWBB
Ship Lose 34’ Carpeting, Pad and Tack Strip